What is required to be completed in order to get power?

First the electrical permit, then an electrical inspection that is approved by a "green tag" being attached to the metering equipment. The electrical service must be completed to the point of the owner/builder having a main disconnect switch to remove power from the building. The metering equipment is to be installed (per utility requirements). The service equipment needs to be installed and connected to the metering equipment, with the main disconnect and the grounding completed. Nothing more is required, no branch circuit breakers or any load side connections.

What is required to be completed in order to get power?

First the electrical permit, then an electrical inspection that is approved by a "green tag" being attached to the metering equipment. The electrical service must be completed to the point of the owner/builder having a main disconnect switch to remove power from the building. The metering equipment is to be installed (per utility requirements). The service equipment needs to be installed and connected to the metering equipment, with the main disconnect and the grounding completed. Nothing more is required, no branch circuit breakers or any load side connections.